Solar power plant · Clark, NV

Playa Solar 2

Playa Solar 2 is a 100 MW solar power plant in Clark County, Nevada, operated by EDF Renewable Asset Holdings, Inc.. Its oldest generator still running came online in 2017. In 2025 it generated 255 GWh, about what 24,000 average Nevada homes use in a year.

Capacity100 MWNameplate, September 2026
Generated255 GWhIn 2025
Capacity factor29%Share of the most it could make, 2025
Generators1Oldest from 2017

Playa Solar 2 in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the 20th largest, about 1.6% of the state's 6.2 GW of solar capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Playa Solar 2 is 1% of that and the 14th largest of 45 solar plants there.

Its capacity factor of 29% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020182019202020212022202320242025GWh 255
01002003004002019202120232025255

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Playa Solar 2 (outlined) and other plants in Clark County, shaded. 36.408, -114.908.

Plant facts

Operator
EDF Renewable Asset Holdings, Inc.
Sector
IPP Non-CHP
Grid operator
NEVP
County
Clark County, NV
EIA plant ID
60261
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Solar Photovoltaic 100 MW 2017 –

Questions

Playa Solar 2, answered

How much power does Playa Solar 2 produce?

Playa Solar 2 has 100 MW of capacity from one generator. In 2025 it generated 255 GWh, 29% of the most it could have made running flat out all year (its capacity factor).

How many homes does Playa Solar 2 power?

Its 2025 output of 255 GWh equals the yearly electricity use of about 24,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Playa Solar 2?

Playa Solar 2 is in Clark County, Nevada, at about 36.408°, -114.908°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Playa Solar 2?

It is operated by EDF Renewable Asset Holdings, Inc. (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Playa Solar 2 open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.