Solar power plant · Clark, NV
Playa Solar 2
Playa Solar 2 is a 100 MW solar power plant in Clark County, Nevada, operated by EDF Renewable Asset Holdings, Inc.. Its oldest generator still running came online in 2017. In 2025 it generated 255 GWh, about what 24,000 average Nevada homes use in a year.
Playa Solar 2 in context
Among the 58 solar plants in Nevada in the EIA's inventory, it is the 20th largest, about 1.6% of the state's 6.2 GW of solar capacity.
Clark County has 64 power plants of 1 MW or more with 14 GW in all; Playa Solar 2 is 1% of that and the 14th largest of 45 solar plants there.
Its capacity factor of 29% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Playa Solar 2 (outlined) and other plants in Clark County, shaded. 36.408, -114.908.
Plant facts
- Operator
- EDF Renewable Asset Holdings, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- NEVP
- County
- Clark County, NV
- EIA plant ID
- 60261
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | 100 MW | 2017 | – |
Questions
Playa Solar 2, answered
How much power does Playa Solar 2 produce?
Playa Solar 2 has 100 MW of capacity from one generator. In 2025 it generated 255 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Playa Solar 2 power?
Its 2025 output of 255 GWh equals the yearly electricity use of about 24,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Playa Solar 2?
Playa Solar 2 is in Clark County, Nevada, at about 36.408°, -114.908°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates Playa Solar 2?
It is operated by EDF Renewable Asset Holdings, Inc. (EIA sector: IPP Non-CHP), and it feeds NV Energy.
When did Playa Solar 2 open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.