Natural gas power plant · Broward, FL
Port Everglades
Port Everglades is a 1.4 GW natural gas power plant in Broward County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2016. In 2025 it generated 4.5 TWh, about what 343,000 average Florida homes use in a year.
Port Everglades in context
Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 16th largest, about 2.4% of the state's 56 GW of natural gas capacity.
Broward County has 6 power plants of 1 MW or more with 4.1 GW in all; Port Everglades is 33% of that and the 2nd largest of 3 natural gas plants there.
Its capacity factor of 38% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Broward County goes 1.4 hours a year without power, the 67th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Port Everglades (outlined) and other plants in Broward County, shaded. 26.086, -80.125.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Broward County, FL
- EIA plant ID
- 617
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 5ST | Natural Gas Fired Combined Cycle | 464 MW | 2016 | – |
| 5A | Natural Gas Fired Combined Cycle | 296 MW | 2016 | – |
| 5B | Natural Gas Fired Combined Cycle | 296 MW | 2016 | – |
| 5C | Natural Gas Fired Combined Cycle | 296 MW | 2016 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| ST1 | Petroleum Liquids | 248 MW | 1960 | 2012 |
| ST2 | Petroleum Liquids | 248 MW | 1961 | 2012 |
| ST3 | Petroleum Liquids | 402 MW | 1964 | 2013 |
| ST4 | Petroleum Liquids | 402 MW | 1965 | 2013 |
| 10 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| 11 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| 12 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| 6 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| 7 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| 8 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| 9 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| GT1 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| GT2 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| GT3 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| GT4 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
| GT5 | Natural Gas Fired Combustion Turbine | 34 MW | 1971 | 2016 |
Nearby
Other plants in Broward County
Questions
Port Everglades, answered
How much power does Port Everglades produce?
Port Everglades has 1.4 GW of capacity from 4 generators. In 2025 it generated 4.5 TWh, 38% of the most it could have made running flat out all year (its capacity factor).
How many homes does Port Everglades power?
Its 2025 output of 4.5 TWh equals the yearly electricity use of about 343,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Port Everglades?
Port Everglades is in Broward County, Florida, at about 26.086°, -80.125°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Broward County goes 1.4 hours a year without power, the 67th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Port Everglades?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Port Everglades open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.