Solar power plant · Yavapai, AZ

Prescott Solar Plant

Prescott Solar Plant is a 11 MW solar power plant in Yavapai County, Arizona, operated by SunE AZ1, LLC. Its oldest generator still running came online in 2011. In 2025 it generated 23 GWh, about what 1,900 average Arizona homes use in a year.

Capacity11 MWNameplate, September 2026
Generated23 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2011

Prescott Solar Plant in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 64th largest, about 0.1% of the state's 9.9 GW of solar capacity.

Yavapai County has 4 power plants of 1 MW or more with 67 MW in all; Prescott Solar Plant is 16% of that and the 2nd largest of 3 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Yavapai County goes 3.0 hours a year without power, the 3rd most of 11 counties in Arizona. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010203020182019202020212022202320242025GWh 23
0102030201920212023202523

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Prescott Solar Plant (outlined) and other plants in Yavapai County, shaded. 34.649, -112.427.

Plant facts

Operator
SunE AZ1, LLC
Sector
IPP Non-CHP
Grid operator
AZPS
County
Yavapai County, AZ
EIA plant ID
58147
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 11 MW 2011 –

Nearby

Other plants in Yavapai County

Questions

Prescott Solar Plant, answered

How much power does Prescott Solar Plant produce?

Prescott Solar Plant has 11 MW of capacity from one generator. In 2025 it generated 23 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does Prescott Solar Plant power?

Its 2025 output of 23 GWh equals the yearly electricity use of about 1,900 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Prescott Solar Plant?

Prescott Solar Plant is in Yavapai County, Arizona, at about 34.649°, -112.427°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Yavapai County goes 3.0 hours a year without power, the 3rd most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Prescott Solar Plant?

It is operated by SunE AZ1, LLC (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.

When did Prescott Solar Plant open?

Its oldest generator still running came online in 2011.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.