Solar power plant · Yavapai, AZ

RE Bagdad Solar I LLC

RE Bagdad Solar I LLC is a 15 MW solar power plant in Yavapai County, Arizona, operated by Deriva Energy. Its oldest generator still running came online in 2011. In 2025 it generated 30 GWh, about what 2,400 average Arizona homes use in a year.

Capacity15 MWNameplate, September 2026
Generated30 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2011

RE Bagdad Solar I LLC in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 59th largest, about 0.2% of the state's 9.9 GW of solar capacity.

Yavapai County has 4 power plants of 1 MW or more with 67 MW in all; RE Bagdad Solar I LLC is 22% of that and the largest of 3 solar plants there.

Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Yavapai County goes 3.0 hours a year without power, the 3rd most of 11 counties in Arizona. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01020304020182019202020212022202320242025GWh 30
010203040201920212023202530

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

RE Bagdad Solar I LLC (outlined) and other plants in Yavapai County, shaded. 34.586, -113.177.

Plant facts

Operator
Deriva Energy
Sector
IPP Non-CHP
Grid operator
AZPS
County
Yavapai County, AZ
EIA plant ID
57790
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 15 MW 2011 –

Nearby

Other plants in Yavapai County

Questions

RE Bagdad Solar I LLC, answered

How much power does RE Bagdad Solar I LLC produce?

RE Bagdad Solar I LLC has 15 MW of capacity from one generator. In 2025 it generated 30 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does RE Bagdad Solar I LLC power?

Its 2025 output of 30 GWh equals the yearly electricity use of about 2,400 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is RE Bagdad Solar I LLC?

RE Bagdad Solar I LLC is in Yavapai County, Arizona, at about 34.586°, -113.177°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Yavapai County goes 3.0 hours a year without power, the 3rd most of 11 counties in Arizona. The county's page has the full outage record.

Who operates RE Bagdad Solar I LLC?

It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.

When did RE Bagdad Solar I LLC open?

Its oldest generator still running came online in 2011.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.