Solar power plant · Brazoria, TX
Second Division Solar
Second Division Solar is a 100 MW solar power plant in Brazoria County, Texas, operated by Lightsource Renewable Energy Asset Management, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 191 GWh, about what 14,000 average Texas homes use in a year.
Second Division Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 147th largest, about 0.3% of the state's 37 GW of solar capacity.
Brazoria County has 42 power plants of 1 MW or more with 6.1 GW in all; Second Division Solar is 2% of that and the 5th largest of 6 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Second Division Solar (outlined) and other plants in Brazoria County, shaded. 29.171, -95.742.
Plant facts
- Operator
- Lightsource Renewable Energy Asset Management, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Brazoria County, TX
- EIA plant ID
- 65981
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TXSD1 | Solar Photovoltaic | 100 MW | 2024 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| TXSD2 | Batteries | 30 MW | 2031 |
Questions
Second Division Solar, answered
How much power does Second Division Solar produce?
Second Division Solar has 100 MW of capacity from one generator. In 2025 it generated 191 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Second Division Solar power?
Its 2025 output of 191 GWh equals the yearly electricity use of about 14,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Second Division Solar?
Second Division Solar is in Brazoria County, Texas, at about 29.171°, -95.742°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Second Division Solar?
It is operated by Lightsource Renewable Energy Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Second Division Solar open?
Its oldest generator still running came online in 2024. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.