Solar power plant · Brazoria, TX

Second Division Solar

Second Division Solar is a 100 MW solar power plant in Brazoria County, Texas, operated by Lightsource Renewable Energy Asset Management, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 191 GWh, about what 14,000 average Texas homes use in a year.

Capacity100 MWNameplate, September 2026
Generated191 GWhIn 2025
Capacity factor22%Share of the most it could make, 2025
Generators1Oldest from 2024

Second Division Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 147th largest, about 0.3% of the state's 37 GW of solar capacity.

Brazoria County has 42 power plants of 1 MW or more with 6.1 GW in all; Second Division Solar is 2% of that and the 5th largest of 6 solar plants there.

Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020242025GWh 191
05010015020025020242025191

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Second Division Solar (outlined) and other plants in Brazoria County, shaded. 29.171, -95.742.

Plant facts

Operator
Lightsource Renewable Energy Asset Management, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Brazoria County, TX
EIA plant ID
65981
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
TXSD1 Solar Photovoltaic 100 MW 2024 –

Planned

GeneratorTechnologyCapacityExpected
TXSD2Batteries30 MW2031

Questions

Second Division Solar, answered

How much power does Second Division Solar produce?

Second Division Solar has 100 MW of capacity from one generator. In 2025 it generated 191 GWh, 22% of the most it could have made running flat out all year (its capacity factor).

How many homes does Second Division Solar power?

Its 2025 output of 191 GWh equals the yearly electricity use of about 14,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Second Division Solar?

Second Division Solar is in Brazoria County, Texas, at about 29.171°, -95.742°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Second Division Solar?

It is operated by Lightsource Renewable Energy Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Second Division Solar open?

Its oldest generator still running came online in 2024. 1 more generator is planned.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.