Solar power plant · Clark, NV
Silver State Solar Power South
Silver State Solar Power South is a 260 MW solar power plant in Clark County, Nevada, operated by Silver State Solar Power South, LLC. Its oldest generator still running came online in 2015. In 2025 it generated 684 GWh, about what 66,000 average Nevada homes use in a year.
Silver State Solar Power South in context
Among the 58 solar plants in Nevada in the EIA's inventory, it is the 6th largest, about 4.2% of the state's 6.2 GW of solar capacity.
Clark County has 64 power plants of 1 MW or more with 14 GW in all; Silver State Solar Power South is 2% of that and the 5th largest of 45 solar plants there.
Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Silver State Solar Power South (outlined) and other plants in Clark County, shaded. 35.630, -115.320.
Plant facts
- Operator
- Silver State Solar Power South, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Clark County, NV
- EIA plant ID
- 58644
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BLK3 | Solar Photovoltaic | 37 MW | 2015 | – |
| BLK6 | Solar Photovoltaic | 37 MW | 2016 | – |
| BLK4 | Solar Photovoltaic | 36 MW | 2016 | – |
| BLK5 | Solar Photovoltaic | 35 MW | 2016 | – |
| BLK7 | Solar Photovoltaic | 35 MW | 2016 | – |
| BLK2 | Solar Photovoltaic | 28 MW | 2015 | – |
| BLK1 | Solar Photovoltaic | 26 MW | 2015 | – |
| BLK8 | Solar Photovoltaic | 26 MW | 2016 | – |
Questions
Silver State Solar Power South, answered
How much power does Silver State Solar Power South produce?
Silver State Solar Power South has 260 MW of capacity from 8 generators. In 2025 it generated 684 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does Silver State Solar Power South power?
Its 2025 output of 684 GWh equals the yearly electricity use of about 66,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Silver State Solar Power South?
Silver State Solar Power South is in Clark County, Nevada, at about 35.630°, -115.320°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates Silver State Solar Power South?
It is operated by Silver State Solar Power South, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Silver State Solar Power South open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.