Storage power plant · Hidalgo, TX

SME Mission II BESS

SME Mission II BESS is a 10 MW storage power plant in Hidalgo County, Texas, operated by SMT Mission II LLC. Its oldest generator still running came online in 2025.

Capacity10 MWNameplate, September 2026
Net energy-0.3 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

SME Mission II BESS in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 135th largest, about 0.1% of the state's 16 GW of storage capacity.

Hidalgo County has 30 power plants of 1 MW or more with 3.4 GW in all; SME Mission II BESS is 0% of that and the 11th largest of 16 storage plants there.

The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

SME Mission II BESS (outlined) and other plants in Hidalgo County, shaded. 26.168, -98.324.

Plant facts

Operator
SMT Mission II LLC
Sector
Commercial Non-CHP
Grid operator
ERCO
County
Hidalgo County, TX
EIA plant ID
69366
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SMTM2 Batteries 10 MW · 10 MWh 2025 –

Questions

SME Mission II BESS, answered

How much can SME Mission II BESS store and deliver?

SME Mission II BESS can deliver up to 10 MW and hold 10 MWh of energy, from one battery or storage system. Its net energy in 2025 was -0.3 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is SME Mission II BESS?

SME Mission II BESS is in Hidalgo County, Texas, at about 26.168°, -98.324°. It is one of 30 power plants of 1 MW or more in the county. The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates SME Mission II BESS?

It is operated by SMT Mission II LLC (EIA sector: Commercial Non-CHP), and it feeds ERCOT, the Texas grid.

When did SME Mission II BESS open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.