Solar power plant · Hendry, FL
Swamp Cabbage
Swamp Cabbage is a 75 MW solar power plant in Hendry County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2026. In 2025 it generated 4.4 GWh, about what 332 average Florida homes use in a year.
Swamp Cabbage in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 154th largest, about 0.5% of the state's 14 GW of solar capacity.
Hendry County has 10 power plants of 1 MW or more with 720 MW in all; Swamp Cabbage is 10% of that and the 9th largest of 9 solar plants there.
The average electricity customer in Hendry County goes 6.1 hours a year without power, the 44th most of 67 counties in Florida. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Swamp Cabbage (outlined) and other plants in Hendry County, shaded. 26.762, -81.253.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Hendry County, FL
- EIA plant ID
- 68276
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2026 | – |
Questions
Swamp Cabbage, answered
How much power does Swamp Cabbage produce?
Swamp Cabbage has 75 MW of capacity from one generator. In 2025 it generated 4.4 GWh.
How many homes does Swamp Cabbage power?
Its 2025 output of 4.4 GWh equals the yearly electricity use of about 332 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Swamp Cabbage?
Swamp Cabbage is in Hendry County, Florida, at about 26.762°, -81.253°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Hendry County goes 6.1 hours a year without power, the 44th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Swamp Cabbage?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Swamp Cabbage open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.