Sweetbay Solar Center is a 75 MW solar power plant in Martin County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2020. In 2025 it generated 131 GWh, about what 9,900 average Florida homes use in a year.
Sweetbay Solar Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 53rd largest, about 0.5% of the state's 14 GW of solar capacity.
Martin County has 5 power plants of 1 MW or more with 2.7 GW in all; Sweetbay Solar Center is 3% of that and the largest of 4 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Martin County goes 2.8 hours a year without power, the 60th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sweetbay Solar Center (outlined) and other plants in Martin County, shaded. 27.060, -80.474.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Martin County, FL
- EIA plant ID
- 62394
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2020 | – |
Nearby
Other plants in Martin County
Questions
Sweetbay Solar Center, answered
How much power does Sweetbay Solar Center produce?
Sweetbay Solar Center has 75 MW of capacity from one generator. In 2025 it generated 131 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sweetbay Solar Center power?
Its 2025 output of 131 GWh equals the yearly electricity use of about 9,900 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sweetbay Solar Center?
Sweetbay Solar Center is in Martin County, Florida, at about 27.060°, -80.474°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Martin County goes 2.8 hours a year without power, the 60th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Sweetbay Solar Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Sweetbay Solar Center open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.