Solar power plant · Martin, FL
White Tail
White Tail is a 75 MW solar power plant in Martin County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2024. In 2025 it generated 156 GWh, about what 12,000 average Florida homes use in a year.
White Tail in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 111th largest, about 0.5% of the state's 14 GW of solar capacity.
Martin County has 5 power plants of 1 MW or more with 2.7 GW in all; White Tail is 3% of that and the 2nd largest of 4 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Martin County goes 2.8 hours a year without power, the 60th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
White Tail (outlined) and other plants in Martin County, shaded. 27.078, -80.379.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Martin County, FL
- EIA plant ID
- 65869
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2024 | – |
Nearby
Other plants in Martin County
Questions
White Tail, answered
How much power does White Tail produce?
White Tail has 75 MW of capacity from one generator. In 2025 it generated 156 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does White Tail power?
Its 2025 output of 156 GWh equals the yearly electricity use of about 12,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is White Tail?
White Tail is in Martin County, Florida, at about 27.078°, -80.379°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Martin County goes 2.8 hours a year without power, the 60th most of 67 counties in Florida. The county's page has the full outage record.
Who operates White Tail?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did White Tail open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.