Storage power plant · Nolan, TX
Sweetwater BESS
Sweetwater BESS is a 10 MW storage power plant in Nolan County, Texas, operated by Sweetwater ESS Assets, LLC. Its oldest generator still running came online in 2021.
Sweetwater BESS in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 138th largest, about 0.1% of the state's 16 GW of storage capacity.
Nolan County has 17 power plants of 1 MW or more with 2.8 GW in all; Sweetwater BESS is 0% of that.
The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Sweetwater BESS (outlined) and other plants in Nolan County, shaded. 32.458, -100.444.
Plant facts
- Operator
- Sweetwater ESS Assets, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Nolan County, TX
- EIA plant ID
- 69413
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 3006 | Batteries | 10 MW · 20 MWh | 2021 | – |
Questions
Sweetwater BESS, answered
How much can Sweetwater BESS store and deliver?
Sweetwater BESS can deliver up to 10 MW and hold 20 MWh of energy, from one battery or storage system. Its net energy in 2025 was -0.8 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Sweetwater BESS?
Sweetwater BESS is in Nolan County, Texas, at about 32.458°, -100.444°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Sweetwater BESS?
It is operated by Sweetwater ESS Assets, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Sweetwater BESS open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.