Wind power plant · Nolan, TX

Sweetwater Wind 1 LLC

Sweetwater Wind 1 LLC is a 38 MW wind power plant in Nolan County, Texas, operated by Leeward Asset Management, LLC. Its oldest generator still running came online in 2003. In 2025 it generated 138 GWh, about what 10,000 average Texas homes use in a year.

Capacity38 MWNameplate, September 2026
Generated138 GWhIn 2025
Capacity factor42%Share of the most it could make, 2025
Generators1Oldest from 2003

Sweetwater Wind 1 LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 215th largest, about 0.1% of the state's 45 GW of wind capacity.

Nolan County has 17 power plants of 1 MW or more with 2.8 GW in all; Sweetwater Wind 1 LLC is 1% of that and the 15th largest of 15 wind plants there.

Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 138
0501001502002019202120232025138

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Sweetwater Wind 1 LLC (outlined) and other plants in Nolan County, shaded. 32.361, -100.339.

Plant facts

Operator
Leeward Asset Management, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Nolan County, TX
EIA plant ID
56211
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SW1 Onshore Wind Turbine 38 MW 2003 –

Questions

Sweetwater Wind 1 LLC, answered

How much power does Sweetwater Wind 1 LLC produce?

Sweetwater Wind 1 LLC has 38 MW of capacity from one generator. In 2025 it generated 138 GWh, 42% of the most it could have made running flat out all year (its capacity factor).

How many homes does Sweetwater Wind 1 LLC power?

Its 2025 output of 138 GWh equals the yearly electricity use of about 10,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Sweetwater Wind 1 LLC?

Sweetwater Wind 1 LLC is in Nolan County, Texas, at about 32.361°, -100.339°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Sweetwater Wind 1 LLC?

It is operated by Leeward Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Sweetwater Wind 1 LLC open?

Its oldest generator still running came online in 2003.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.