Wind power plant · Nolan, TX
Sweetwater Wind 5
Sweetwater Wind 5 is a 81 MW wind power plant in Nolan County, Texas, operated by Leeward Asset Management, LLC. Its oldest generator still running came online in 2007. In 2025 it generated 173 GWh, about what 13,000 average Texas homes use in a year.
Sweetwater Wind 5 in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 198th largest, about 0.2% of the state's 45 GW of wind capacity.
Nolan County has 17 power plants of 1 MW or more with 2.8 GW in all; Sweetwater Wind 5 is 3% of that and the 14th largest of 15 wind plants there.
Its capacity factor of 25% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sweetwater Wind 5 (outlined) and other plants in Nolan County, shaded. 32.237, -100.483.
Plant facts
- Operator
- Leeward Asset Management, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Nolan County, TX
- EIA plant ID
- 56372
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SW5 | Onshore Wind Turbine | 81 MW | 2007 | – |
Questions
Sweetwater Wind 5, answered
How much power does Sweetwater Wind 5 produce?
Sweetwater Wind 5 has 81 MW of capacity from one generator. In 2025 it generated 173 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sweetwater Wind 5 power?
Its 2025 output of 173 GWh equals the yearly electricity use of about 13,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sweetwater Wind 5?
Sweetwater Wind 5 is in Nolan County, Texas, at about 32.237°, -100.483°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Sweetwater Wind 5?
It is operated by Leeward Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Sweetwater Wind 5 open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.