Solar power plant · Clark, NV

Techren Solar V

Techren Solar V is a 50 MW solar power plant in Clark County, Nevada, operated by Techren Solar V LLC. Its oldest generator still running came online in 2020. In 2025 it generated 108 GWh, about what 10,000 average Nevada homes use in a year.

Capacity50 MWNameplate, September 2026
Generated108 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2020

Techren Solar V in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the 31st largest, about 0.8% of the state's 6.2 GW of solar capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Techren Solar V is 0% of that and the 23rd largest of 45 solar plants there.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150200202020212022202320242025GWh 108
050100150200202020212022202320242025108

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Techren Solar V (outlined) and other plants in Clark County, shaded. 35.900, -114.926.

Plant facts

Operator
Techren Solar V LLC
Sector
IPP Non-CHP
Grid operator
NEVP
County
Clark County, NV
EIA plant ID
62440
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
TECH5 Solar Photovoltaic 50 MW 2020 –

Questions

Techren Solar V, answered

How much power does Techren Solar V produce?

Techren Solar V has 50 MW of capacity from one generator. In 2025 it generated 108 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Techren Solar V power?

Its 2025 output of 108 GWh equals the yearly electricity use of about 10,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Techren Solar V?

Techren Solar V is in Clark County, Nevada, at about 35.900°, -114.926°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Techren Solar V?

It is operated by Techren Solar V LLC (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Techren Solar V open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.