Solar power plant · Clark, NV
Townsite Solar Project Hybrid
Townsite Solar Project Hybrid is a 270 MW solar power plant in Clark County, Nevada, operated by Townsite Solar, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 466 GWh, about what 45,000 average Nevada homes use in a year.
Townsite Solar Project Hybrid in context
Among the 58 solar plants in Nevada in the EIA's inventory, it is the 5th largest, about 4.4% of the state's 6.2 GW of solar capacity.
Clark County has 64 power plants of 1 MW or more with 14 GW in all; Townsite Solar Project Hybrid is 2% of that and the 4th largest of 45 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Townsite Solar Project Hybrid (outlined) and other plants in Clark County, shaded. 35.937, -114.884.
Plant facts
- Operator
- Townsite Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- WALC
- County
- Clark County, NV
- EIA plant ID
- 60654
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | 180 MW | 2021 | – |
| GEN02 | Batteries | 90 MW · 360 MWh | 2021 | – |
Questions
Townsite Solar Project Hybrid, answered
How much power does Townsite Solar Project Hybrid produce?
Townsite Solar Project Hybrid has 270 MW of capacity from 2 generators. In 2025 it generated 466 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Townsite Solar Project Hybrid power?
Its 2025 output of 466 GWh equals the yearly electricity use of about 45,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Townsite Solar Project Hybrid?
Townsite Solar Project Hybrid is in Clark County, Nevada, at about 35.937°, -114.884°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates Townsite Solar Project Hybrid?
It is operated by Townsite Solar, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority WALC.
When did Townsite Solar Project Hybrid open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.