Solar power plant · Clark, NV

Townsite Solar Project Hybrid

Townsite Solar Project Hybrid is a 270 MW solar power plant in Clark County, Nevada, operated by Townsite Solar, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 466 GWh, about what 45,000 average Nevada homes use in a year.

Capacity270 MWNameplate, September 2026
Generated466 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators2Oldest from 2021

Townsite Solar Project Hybrid in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the 5th largest, about 4.4% of the state's 6.2 GW of solar capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Townsite Solar Project Hybrid is 2% of that and the 4th largest of 45 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060020212022202320242025GWh 466
020040060020212022202320242025466

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Townsite Solar Project Hybrid (outlined) and other plants in Clark County, shaded. 35.937, -114.884.

Plant facts

Operator
Townsite Solar, LLC
Sector
IPP Non-CHP
Grid operator
WALC
County
Clark County, NV
EIA plant ID
60654
  • Solar180 MW67%
  • Storage90 MW33%
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN01 Solar Photovoltaic 180 MW 2021 –
GEN02 Batteries 90 MW · 360 MWh 2021 –

Questions

Townsite Solar Project Hybrid, answered

How much power does Townsite Solar Project Hybrid produce?

Townsite Solar Project Hybrid has 270 MW of capacity from 2 generators. In 2025 it generated 466 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Townsite Solar Project Hybrid power?

Its 2025 output of 466 GWh equals the yearly electricity use of about 45,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Townsite Solar Project Hybrid?

Townsite Solar Project Hybrid is in Clark County, Nevada, at about 35.937°, -114.884°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Townsite Solar Project Hybrid?

It is operated by Townsite Solar, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority WALC.

When did Townsite Solar Project Hybrid open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.