Storage power plant · Ector, TX
Westover BESS
Westover BESS is a 10 MW storage power plant in Ector County, Texas, operated by Westover ESS Assets, LLC. Its oldest generator still running came online in 2021.
Westover BESS in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 139th largest, about 0.1% of the state's 16 GW of storage capacity.
Ector County has 21 power plants of 1 MW or more with 3.3 GW in all; Westover BESS is 0% of that and the largest of 4 storage plants there.
The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Westover BESS (outlined) and other plants in Ector County, shaded. 31.836, -102.444.
Plant facts
- Operator
- Westover ESS Assets, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Ector County, TX
- EIA plant ID
- 69415
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 3007 | Batteries | 10 MW · 20 MWh | 2021 | – |
Questions
Westover BESS, answered
How much can Westover BESS store and deliver?
Westover BESS can deliver up to 10 MW and hold 20 MWh of energy, from one battery or storage system. Its net energy in 2025 was -0.8 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Westover BESS?
Westover BESS is in Ector County, Texas, at about 31.836°, -102.444°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Westover BESS?
It is operated by Westover ESS Assets, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Westover BESS open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.