Solar power plant · Clark, NV

Yellow Pine II

Yellow Pine II is a 210 MW solar power plant in Clark County, Nevada, operated by Yellow Pine Solar II, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 374 GWh, about what 36,000 average Nevada homes use in a year.

Capacity210 MWNameplate, September 2026
Generated374 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators4Oldest from 2024

Yellow Pine II in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the 12th largest, about 3.4% of the state's 6.2 GW of solar capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Yellow Pine II is 1% of that and the 10th largest of 45 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020242025GWh 374
010020030040050020242025374

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Yellow Pine II (outlined) and other plants in Clark County, shaded. 36.076, -115.791.

Plant facts

Operator
Yellow Pine Solar II, LLC
Sector
IPP Non-CHP
Grid operator
NEVP
County
Clark County, NV
EIA plant ID
67091
  • Solar125 MW60%
  • Storage85 MW40%
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
YP2BP Solar Photovoltaic 65 MW 2024 –
YP2AP Solar Photovoltaic 60 MW 2024 –
YP2AB Batteries 53 MW · 212 MWh 2024 –
YP2BB Batteries 32 MW · 128 MWh 2024 –

Questions

Yellow Pine II, answered

How much power does Yellow Pine II produce?

Yellow Pine II has 210 MW of capacity from 4 generators. In 2025 it generated 374 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Yellow Pine II power?

Its 2025 output of 374 GWh equals the yearly electricity use of about 36,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Yellow Pine II?

Yellow Pine II is in Clark County, Nevada, at about 36.076°, -115.791°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Yellow Pine II?

It is operated by Yellow Pine Solar II, LLC (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Yellow Pine II open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.