Solar power plant · Clark, NV

Yellow Pine Solar

Yellow Pine Solar is a 190 MW solar power plant in Clark County, Nevada, operated by Yellow Pine Solar, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 376 GWh, about what 36,000 average Nevada homes use in a year.

Capacity190 MWNameplate, September 2026
Generated376 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators2Oldest from 2023

Yellow Pine Solar in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the 14th largest, about 3.1% of the state's 6.2 GW of solar capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Yellow Pine Solar is 1% of that and the 12th largest of 45 solar plants there.

Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300400500202320242025GWh 376
0100200300400500202320242025376

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Yellow Pine Solar (outlined) and other plants in Clark County, shaded. 36.066, -115.775.

Plant facts

Operator
Yellow Pine Solar, LLC
Sector
IPP Non-CHP
Grid operator
NEVP
County
Clark County, NV
EIA plant ID
66357
  • Solar125 MW66%
  • Storage65 MW34%
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
YPS1 Solar Photovoltaic 125 MW 2023 –
YPES Batteries 65 MW · 260 MWh 2023 –

Questions

Yellow Pine Solar, answered

How much power does Yellow Pine Solar produce?

Yellow Pine Solar has 190 MW of capacity from 2 generators. In 2025 it generated 376 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Yellow Pine Solar power?

Its 2025 output of 376 GWh equals the yearly electricity use of about 36,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Yellow Pine Solar?

Yellow Pine Solar is in Clark County, Nevada, at about 36.066°, -115.775°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Yellow Pine Solar?

It is operated by Yellow Pine Solar, LLC (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Yellow Pine Solar open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.