Wind power plant · Adair, IA

Adair Wind Farm

Adair Wind Farm is a 175 MW wind power plant in Adair County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2008. In 2025 it generated 551 GWh, about what 53,000 average Iowa homes use in a year.

Capacity175 MWNameplate, September 2026
Generated551 GWhIn 2025
Capacity factor36%Share of the most it could make, 2025
Generators1Oldest from 2008

Adair Wind Farm in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 32nd largest, about 1.3% of the state's 13 GW of wind capacity.

Adair County has 16 power plants of 1 MW or more with 1.2 GW in all; Adair Wind Farm is 15% of that and the 3rd largest of 12 wind plants there.

Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Adair County goes 1.4 hours a year without power, the 92nd most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 551
02004006008002019202120232025551

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Adair Wind Farm (outlined) and other plants in Adair County, shaded. 41.424, -94.665.

Plant facts

Operator
MidAmerican Energy Co
Sector
Electric Utility
Grid operator
MISO
County
Adair County, IA
EIA plant ID
56810
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
AWF Onshore Wind Turbine 175 MW 2008 –

Nearby

Other plants in Adair County

Orient Wind Farm · 501 MWArbor Hill Wind Farm · 310 MWMorning Light Wind Farm · 111 MWArbor Hill Solar · 25 MWNorth Generation Plant · 8.0 MWDowntown Generation Plant · 5.0 MWGilliam South · 4.3 MWWind GEM · 1.9 MW

Questions

Adair Wind Farm, answered

How much power does Adair Wind Farm produce?

Adair Wind Farm has 175 MW of capacity from one generator. In 2025 it generated 551 GWh, 36% of the most it could have made running flat out all year (its capacity factor).

How many homes does Adair Wind Farm power?

Its 2025 output of 551 GWh equals the yearly electricity use of about 53,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Adair Wind Farm?

Adair Wind Farm is in Adair County, Iowa, at about 41.424°, -94.665°. It is one of 16 power plants of 1 MW or more in the county. The average electricity customer in Adair County goes 1.4 hours a year without power, the 92nd most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Adair Wind Farm?

It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.

When did Adair Wind Farm open?

Its oldest generator still running came online in 2008.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.