Wind power plant · Adair, IA

Arbor Hill Wind Farm

Arbor Hill Wind Farm is a 310 MW wind power plant in Adair County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2018. In 2025 it generated 1.1 TWh, about what 111,000 average Iowa homes use in a year.

Capacity310 MWNameplate, September 2026
Generated1.1 TWhIn 2025
Capacity factor42%Share of the most it could make, 2025
Generators2Oldest from 2018

Arbor Hill Wind Farm in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 7th largest, about 2.3% of the state's 13 GW of wind capacity.

Adair County has 16 power plants of 1 MW or more with 1.2 GW in all; Arbor Hill Wind Farm is 27% of that and the 2nd largest of 12 wind plants there.

Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Adair County goes 1.4 hours a year without power, the 92nd most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,50020182019202020212022202320242025GWh 1,148
05001,0001,50020192021202320251,148

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Arbor Hill Wind Farm (outlined) and other plants in Adair County, shaded. 41.404, -94.261.

Plant facts

Operator
MidAmerican Energy Co
Sector
Electric Utility
Grid operator
MISO
County
Adair County, IA
EIA plant ID
62132
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WT1 Onshore Wind Turbine 250 MW 2018 –
1 Onshore Wind Turbine 60 MW 2020 –

Nearby

Other plants in Adair County

Orient Wind Farm · 501 MWAdair Wind Farm · 175 MWMorning Light Wind Farm · 111 MWArbor Hill Solar · 25 MWNorth Generation Plant · 8.0 MWDowntown Generation Plant · 5.0 MWGilliam South · 4.3 MWWind GEM · 1.9 MW

Questions

Arbor Hill Wind Farm, answered

How much power does Arbor Hill Wind Farm produce?

Arbor Hill Wind Farm has 310 MW of capacity from 2 generators. In 2025 it generated 1.1 TWh, 42% of the most it could have made running flat out all year (its capacity factor).

How many homes does Arbor Hill Wind Farm power?

Its 2025 output of 1.1 TWh equals the yearly electricity use of about 111,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Arbor Hill Wind Farm?

Arbor Hill Wind Farm is in Adair County, Iowa, at about 41.404°, -94.261°. It is one of 16 power plants of 1 MW or more in the county. The average electricity customer in Adair County goes 1.4 hours a year without power, the 92nd most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Arbor Hill Wind Farm?

It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.

When did Arbor Hill Wind Farm open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.