Wind power plant · Adair, IA

Morning Light Wind Farm

Morning Light Wind Farm is a 111 MW wind power plant in Adair County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2012. In 2025 it generated 407 GWh, about what 39,000 average Iowa homes use in a year.

Capacity111 MWNameplate, September 2026
Generated407 GWhIn 2025
Capacity factor42%Share of the most it could make, 2025
Generators1Oldest from 2012

Morning Light Wind Farm in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 51st largest, about 0.8% of the state's 13 GW of wind capacity.

Adair County has 16 power plants of 1 MW or more with 1.2 GW in all; Morning Light Wind Farm is 10% of that and the 4th largest of 12 wind plants there.

Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Adair County goes 1.4 hours a year without power, the 92nd most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 407
01002003004005002019202120232025407

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Morning Light Wind Farm (outlined) and other plants in Adair County, shaded. 41.454, -94.575.

Plant facts

Operator
MidAmerican Energy Co
Sector
Electric Utility
Grid operator
MISO
County
Adair County, IA
EIA plant ID
57875
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MLWF Onshore Wind Turbine 111 MW 2012 –

Nearby

Other plants in Adair County

Orient Wind Farm · 501 MWArbor Hill Wind Farm · 310 MWAdair Wind Farm · 175 MWArbor Hill Solar · 25 MWNorth Generation Plant · 8.0 MWDowntown Generation Plant · 5.0 MWGilliam South · 4.3 MWWind GEM · 1.9 MW

Questions

Morning Light Wind Farm, answered

How much power does Morning Light Wind Farm produce?

Morning Light Wind Farm has 111 MW of capacity from one generator. In 2025 it generated 407 GWh, 42% of the most it could have made running flat out all year (its capacity factor).

How many homes does Morning Light Wind Farm power?

Its 2025 output of 407 GWh equals the yearly electricity use of about 39,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Morning Light Wind Farm?

Morning Light Wind Farm is in Adair County, Iowa, at about 41.454°, -94.575°. It is one of 16 power plants of 1 MW or more in the county. The average electricity customer in Adair County goes 1.4 hours a year without power, the 92nd most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Morning Light Wind Farm?

It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.

When did Morning Light Wind Farm open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.