Wind power plant · Adair, IA
Orient Wind Farm
Orient Wind Farm is a 501 MW wind power plant in Adair County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2018. In 2025 it generated 1.8 TWh, about what 176,000 average Iowa homes use in a year.
Orient Wind Farm in context
Among the 123 wind plants in Iowa in the EIA's inventory, it is the 2nd largest, about 3.7% of the state's 13 GW of wind capacity.
Adair County has 16 power plants of 1 MW or more with 1.2 GW in all; Orient Wind Farm is 43% of that and the largest of 12 wind plants there.
Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Adair County goes 1.4 hours a year without power, the 92nd most of 98 counties in Iowa. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Orient Wind Farm (outlined) and other plants in Adair County, shaded. 41.202, -94.417.
Plant facts
- Operator
- MidAmerican Energy Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Adair County, IA
- EIA plant ID
- 61077
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 2 | Onshore Wind Turbine | 399 MW | 2019 | – |
| 1 | Onshore Wind Turbine | 102 MW | 2018 | – |
Nearby
Other plants in Adair County
Questions
Orient Wind Farm, answered
How much power does Orient Wind Farm produce?
Orient Wind Farm has 501 MW of capacity from 2 generators. In 2025 it generated 1.8 TWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Orient Wind Farm power?
Its 2025 output of 1.8 TWh equals the yearly electricity use of about 176,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Orient Wind Farm?
Orient Wind Farm is in Adair County, Iowa, at about 41.202°, -94.417°. It is one of 16 power plants of 1 MW or more in the county. The average electricity customer in Adair County goes 1.4 hours a year without power, the 92nd most of 98 counties in Iowa. The county's page has the full outage record.
Who operates Orient Wind Farm?
It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.
When did Orient Wind Farm open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.