Storage power plant · Cameron, TX

Aggreko MSR Grid PC7

Aggreko MSR Grid PC7 is a 10 MW storage power plant in Cameron County, Texas, operated by DGI Rattler LLC. Its oldest generator still running came online in 2026.

Capacity10 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Aggreko MSR Grid PC7 in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 142nd largest, about 0.1% of the state's 16 GW of storage capacity.

Cameron County has 23 power plants of 1 MW or more with 1.6 GW in all; Aggreko MSR Grid PC7 is 1% of that and the 8th largest of 9 storage plants there.

The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Aggreko MSR Grid PC7 (outlined) and other plants in Cameron County, shaded. 26.001, -97.522.

Plant facts

Operator
DGI Rattler LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Cameron County, TX
EIA plant ID
69418
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PC7 Batteries 10 MW · 19 MWh 2026 –

Questions

Aggreko MSR Grid PC7, answered

How much can Aggreko MSR Grid PC7 store and deliver?

Aggreko MSR Grid PC7 can deliver up to 10 MW and hold 19 MWh of energy, from one battery or storage system.

Where is Aggreko MSR Grid PC7?

Aggreko MSR Grid PC7 is in Cameron County, Texas, at about 26.001°, -97.522°. It is one of 23 power plants of 1 MW or more in the county. The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Aggreko MSR Grid PC7?

It is operated by DGI Rattler LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Aggreko MSR Grid PC7 open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.