Storage power plant · Pecos, TX

Alamo Clean Energy Center (BESS)

Alamo Clean Energy Center (BESS) is a 10 MW storage power plant in Pecos County, Texas, operated by On Energy Storage. Its oldest generator still running came online in 2026.

Capacity10 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Alamo Clean Energy Center (BESS) in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 113th largest, about 0.1% of the state's 16 GW of storage capacity.

Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Alamo Clean Energy Center (BESS) is 0% of that and the 8th largest of 12 storage plants there.

The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Alamo Clean Energy Center (BESS) (outlined) and other plants in Pecos County, shaded. 30.902, -102.873.

Plant facts

Operator
On Energy Storage
Sector
IPP Non-CHP
Grid operator
ERCO
County
Pecos County, TX
EIA plant ID
69453
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ALBA1 Batteries 10 MW · 20 MWh 2026 –

Questions

Alamo Clean Energy Center (BESS), answered

How much can Alamo Clean Energy Center (BESS) store and deliver?

Alamo Clean Energy Center (BESS) can deliver up to 10 MW and hold 20 MWh of energy, from one battery or storage system.

Where is Alamo Clean Energy Center (BESS)?

Alamo Clean Energy Center (BESS) is in Pecos County, Texas, at about 30.902°, -102.873°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Alamo Clean Energy Center (BESS)?

It is operated by On Energy Storage (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Alamo Clean Energy Center (BESS) open?

Its oldest generator still running came online in 2026.