Solar power plant · Pecos, TX
Midway Solar - TX
Midway Solar - TX is a 182 MW solar power plant in Pecos County, Texas, operated by Midway Solar. Its oldest generator still running came online in 2018. In 2025 it generated 333 GWh, about what 25,000 average Texas homes use in a year.
Midway Solar - TX in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 99th largest, about 0.5% of the state's 37 GW of solar capacity.
Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Midway Solar - TX is 5% of that and the 6th largest of 13 solar plants there.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Midway Solar - TX (outlined) and other plants in Pecos County, shaded. 30.996, -102.224.
Plant facts
- Operator
- Midway Solar
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Pecos County, TX
- EIA plant ID
- 61368
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 182 MW | 2018 | – |
Questions
Midway Solar - TX, answered
How much power does Midway Solar - TX produce?
Midway Solar - TX has 182 MW of capacity from one generator. In 2025 it generated 333 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Midway Solar - TX power?
Its 2025 output of 333 GWh equals the yearly electricity use of about 25,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Midway Solar - TX?
Midway Solar - TX is in Pecos County, Texas, at about 30.996°, -102.224°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Midway Solar - TX?
It is operated by Midway Solar (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Midway Solar - TX open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.