Wind power plant · Pecos, TX
Desert Sky
Desert Sky is a 168 MW wind power plant in Pecos County, Texas, operated by Desert Sky Wind Farm LP. Its oldest generator still running came online in 2002. In 2025 it generated 541 GWh, about what 41,000 average Texas homes use in a year.
Desert Sky in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 130th largest, about 0.4% of the state's 45 GW of wind capacity.
Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Desert Sky is 4% of that and the largest of 5 wind plants there.
Its capacity factor of 37% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Desert Sky (outlined) and other plants in Pecos County, shaded. 30.918, -102.087.
Plant facts
- Operator
- Desert Sky Wind Farm LP
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Pecos County, TX
- EIA plant ID
- 55992
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 168 MW | 2002 | – |
Questions
Desert Sky, answered
How much power does Desert Sky produce?
Desert Sky has 168 MW of capacity from one generator. In 2025 it generated 541 GWh, 37% of the most it could have made running flat out all year (its capacity factor).
How many homes does Desert Sky power?
Its 2025 output of 541 GWh equals the yearly electricity use of about 41,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Desert Sky?
Desert Sky is in Pecos County, Texas, at about 30.918°, -102.087°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Desert Sky?
It is operated by Desert Sky Wind Farm LP (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Desert Sky open?
Its oldest generator still running came online in 2002.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.