Greasewood Solar is a 255 MW solar power plant in Pecos County, Texas, operated by Concho Bluff LLC. Its oldest generator still running came online in 2021. In 2025 it generated 408 GWh, about what 31,000 average Texas homes use in a year.
Greasewood Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 40th largest, about 0.7% of the state's 37 GW of solar capacity.
Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Greasewood Solar is 7% of that and the 3rd largest of 13 solar plants there.
Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Greasewood Solar (outlined) and other plants in Pecos County, shaded. 31.031, -102.488.
Plant facts
- Operator
- Concho Bluff LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Pecos County, TX
- EIA plant ID
- 62804
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GREA1 | Solar Photovoltaic | 255 MW | 2021 | – |
Questions
Greasewood Solar, answered
How much power does Greasewood Solar produce?
Greasewood Solar has 255 MW of capacity from one generator. In 2025 it generated 408 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does Greasewood Solar power?
Its 2025 output of 408 GWh equals the yearly electricity use of about 31,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Greasewood Solar?
Greasewood Solar is in Pecos County, Texas, at about 31.031°, -102.488°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Greasewood Solar?
It is operated by Concho Bluff LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Greasewood Solar open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.