Natural gas power plant · Norfolk, MA

ANP Bellingham Energy Project

ANP Bellingham Energy Project is a 578 MW natural gas power plant in Norfolk County, Massachusetts, operated by Bellingham Power Generation LLC. Its oldest generator still running came online in 2002. In 2025 it generated 3.5 TWh, about what 491,000 average Massachusetts homes use in a year.

Capacity578 MWNameplate, September 2026
Generated3.5 TWhIn 2025
Capacity factor69%Share of the most it could make, 2025
Generators2Oldest from 2002

ANP Bellingham Energy Project in context

Among the 42 natural gas plants in Massachusetts in the EIA's inventory, it is the 3rd largest, about 9.6% of the state's 6.0 GW of natural gas capacity.

Norfolk County has 37 power plants of 1 MW or more with 2.7 GW in all; ANP Bellingham Energy Project is 21% of that and the 2nd largest of 7 natural gas plants there.

Its capacity factor of 69% in 2025 is higher than the 23% typical for natural gas plants across the US.

The average electricity customer in Norfolk County goes 4.9 hours a year without power, the 8th most of 14 counties in Massachusetts. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01,0002,0003,0004,00020182019202020212022202320242025GWh 3,509
01,0002,0003,0004,00020192021202320253,509

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

ANP Bellingham Energy Project (outlined) and other plants in Norfolk County, shaded. 42.111, -71.453.

Plant facts

Operator
Bellingham Power Generation LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
Norfolk County, MA
EIA plant ID
55211
Where Massachusetts's power comes from → Massachusetts power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
U1 Natural Gas Fired Combined Cycle 289 MW 2002 –
U2 Natural Gas Fired Combined Cycle 289 MW 2002 –

Questions

ANP Bellingham Energy Project, answered

How much power does ANP Bellingham Energy Project produce?

ANP Bellingham Energy Project has 578 MW of capacity from 2 generators. In 2025 it generated 3.5 TWh, 69% of the most it could have made running flat out all year (its capacity factor).

How many homes does ANP Bellingham Energy Project power?

Its 2025 output of 3.5 TWh equals the yearly electricity use of about 491,000 average Massachusetts homes (596 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is ANP Bellingham Energy Project?

ANP Bellingham Energy Project is in Norfolk County, Massachusetts, at about 42.111°, -71.453°. It is one of 37 power plants of 1 MW or more in the county. The average electricity customer in Norfolk County goes 4.9 hours a year without power, the 8th most of 14 counties in Massachusetts. The county's page has the full outage record.

Who operates ANP Bellingham Energy Project?

It is operated by Bellingham Power Generation LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did ANP Bellingham Energy Project open?

Its oldest generator still running came online in 2002.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Massachusetts home's 596 kWh a month in 2025. Methodology.