Storage power plant · Norfolk, MA

Medway Grid

Medway Grid is a 250 MW storage power plant in Norfolk County, Massachusetts, operated by Medway Grid LLC. Its oldest generator still running came online in 2026.

Capacity250 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Medway Grid in context

Among the 40 storage plants in Massachusetts in the EIA's inventory, it is the 3rd largest, about 10% of the state's 2.4 GW of storage capacity.

Norfolk County has 37 power plants of 1 MW or more with 2.7 GW in all; Medway Grid is 9% of that and the largest of 3 storage plants there.

The average electricity customer in Norfolk County goes 4.9 hours a year without power, the 8th most of 14 counties in Massachusetts. The county's page has the full outage record.

Where it is

Medway Grid (outlined) and other plants in Norfolk County, shaded. 42.145, -71.447.

Plant facts

Operator
Medway Grid LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
Norfolk County, MA
EIA plant ID
69720
Where Massachusetts's power comes from → Massachusetts power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MEDWA Batteries 250 MW · 500 MWh 2026 –

Questions

Medway Grid, answered

How much can Medway Grid store and deliver?

Medway Grid can deliver up to 250 MW and hold 500 MWh of energy, from one battery or storage system.

Where is Medway Grid?

Medway Grid is in Norfolk County, Massachusetts, at about 42.145°, -71.447°. It is one of 37 power plants of 1 MW or more in the county. The average electricity customer in Norfolk County goes 4.9 hours a year without power, the 8th most of 14 counties in Massachusetts. The county's page has the full outage record.

Who operates Medway Grid?

It is operated by Medway Grid LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did Medway Grid open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.