Natural gas power plant · Norfolk, MA
Bellingham Cogeneration Facility
Bellingham Cogeneration Facility is a 386 MW natural gas power plant in Norfolk County, Massachusetts, operated by Northeast Energy Associates LP. Its oldest generator still running came online in 1991. In 2025 it generated 318 GWh, about what 44,000 average Massachusetts homes use in a year.
Bellingham Cogeneration Facility in context
Among the 42 natural gas plants in Massachusetts in the EIA's inventory, it is the 6th largest, about 6.4% of the state's 6.0 GW of natural gas capacity.
Norfolk County has 37 power plants of 1 MW or more with 2.7 GW in all; Bellingham Cogeneration Facility is 14% of that and the 3rd largest of 7 natural gas plants there.
Its capacity factor of 9% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Norfolk County goes 4.9 hours a year without power, the 8th most of 14 counties in Massachusetts. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bellingham Cogeneration Facility (outlined) and other plants in Norfolk County, shaded. 42.093, -71.483.
Plant facts
- Operator
- Northeast Energy Associates LP
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Norfolk County, MA
- EIA plant ID
- 10307
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CT1 | Natural Gas Fired Combined Cycle | 129 MW | 1991 | – |
| CT2 | Natural Gas Fired Combined Cycle | 129 MW | 1991 | – |
| ST1 | Natural Gas Fired Combined Cycle | 129 MW | 1991 | – |
Questions
Bellingham Cogeneration Facility, answered
How much power does Bellingham Cogeneration Facility produce?
Bellingham Cogeneration Facility has 386 MW of capacity from 3 generators. In 2025 it generated 318 GWh, 9% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bellingham Cogeneration Facility power?
Its 2025 output of 318 GWh equals the yearly electricity use of about 44,000 average Massachusetts homes (596 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bellingham Cogeneration Facility?
Bellingham Cogeneration Facility is in Norfolk County, Massachusetts, at about 42.093°, -71.483°. It is one of 37 power plants of 1 MW or more in the county. The average electricity customer in Norfolk County goes 4.9 hours a year without power, the 8th most of 14 counties in Massachusetts. The county's page has the full outage record.
Who operates Bellingham Cogeneration Facility?
It is operated by Northeast Energy Associates LP (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Bellingham Cogeneration Facility open?
Its oldest generator still running came online in 1991.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Massachusetts home's 596 kWh a month in 2025. Methodology.