Storage power plant · La Paz, AZ

Atlas IX

Atlas IX is a 150 MW storage power plant in La Paz County, Arizona, operated by Atlas IX LLC. Its oldest generator still running came online in 2025.

Capacity150 MWNameplate, September 2026
Net energy-1.5 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Atlas IX in context

Among the 41 storage plants in Arizona in the EIA's inventory, it is the 17th largest, about 2.4% of the state's 6.3 GW of storage capacity.

La Paz County has 7 power plants of 1 MW or more with 1.6 GW in all; Atlas IX is 10% of that and the 2nd largest of 2 storage plants there.

The average electricity customer in La Paz County goes 10 hours a year without power. The county's page has the full outage record.

Where it is

Atlas IX (outlined) and other plants in La Paz County, shaded. 33.583, -113.577.

Plant facts

Operator
Atlas IX LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
La Paz County, AZ
EIA plant ID
68324
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ALT9 Batteries 150 MW · 600 MWh 2025 –

Questions

Atlas IX, answered

How much can Atlas IX store and deliver?

Atlas IX can deliver up to 150 MW and hold 600 MWh of energy, from one battery or storage system. Its net energy in 2025 was -1.5 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Atlas IX?

Atlas IX is in La Paz County, Arizona, at about 33.583°, -113.577°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in La Paz County goes 10 hours a year without power. The county's page has the full outage record.

Who operates Atlas IX?

It is operated by Atlas IX LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Atlas IX open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.