Solar power plant · La Paz, AZ

ATLAS Solar VI, LLC

ATLAS Solar VI, LLC is a 100 MW solar power plant in La Paz County, Arizona, operated by ATLAS Solar VI, LLC. Its oldest generator still running came online in 2026.

Capacity100 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

ATLAS Solar VI, LLC in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 34th largest, about 1.0% of the state's 9.9 GW of solar capacity.

La Paz County has 7 power plants of 1 MW or more with 1.6 GW in all; ATLAS Solar VI, LLC is 6% of that and the 3rd largest of 4 solar plants there.

The average electricity customer in La Paz County goes 10 hours a year without power. The county's page has the full outage record.

Where it is

ATLAS Solar VI, LLC (outlined) and other plants in La Paz County, shaded. 33.579, -113.574.

Plant facts

Operator
ATLAS Solar VI, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
La Paz County, AZ
EIA plant ID
69238
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ATL6 Solar Photovoltaic 100 MW 2026 –

Questions

ATLAS Solar VI, LLC, answered

How much power does ATLAS Solar VI, LLC produce?

ATLAS Solar VI, LLC has 100 MW of capacity from one generator. No full year of generation is reported yet.

Where is ATLAS Solar VI, LLC?

ATLAS Solar VI, LLC is in La Paz County, Arizona, at about 33.579°, -113.574°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in La Paz County goes 10 hours a year without power. The county's page has the full outage record.

Who operates ATLAS Solar VI, LLC?

It is operated by ATLAS Solar VI, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did ATLAS Solar VI, LLC open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.