Hydro power plant · La Paz, AZ
Headgate Rock
Headgate Rock is a 20 MW hydro power plant in La Paz County, Arizona, operated by Colorado River Indian Irr Proj. Its oldest generator still running came online in 1993. In 2025 it generated 41 GWh, about what 3,300 average Arizona homes use in a year.
Headgate Rock in context
Among the 8 hydro plants in Arizona in the EIA's inventory, it is the 5th largest, about 0.7% of the state's 2.7 GW of hydro capacity.
La Paz County has 7 power plants of 1 MW or more with 1.6 GW in all; Headgate Rock is 1% of that.
Its capacity factor of 24% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in La Paz County goes 10 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Headgate Rock (outlined) and other plants in La Paz County, shaded. 34.168, -114.277.
Plant facts
- Operator
- Colorado River Indian Irr Proj
- Sector
- Electric Utility
- Grid operator
- WALC
- County
- La Paz County, AZ
- EIA plant ID
- 7179
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 6.5 MW | 1993 | – |
| 2 | Conventional Hydroelectric | 6.5 MW | 1993 | – |
| 3 | Conventional Hydroelectric | 6.5 MW | 1993 | – |
Nearby
Other plants in La Paz County
Questions
Headgate Rock, answered
How much power does Headgate Rock produce?
Headgate Rock has 20 MW of capacity from 3 generators. In 2025 it generated 41 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Headgate Rock power?
Its 2025 output of 41 GWh equals the yearly electricity use of about 3,300 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Headgate Rock?
Headgate Rock is in La Paz County, Arizona, at about 34.168°, -114.277°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in La Paz County goes 10 hours a year without power. The county's page has the full outage record.
Who operates Headgate Rock?
It is operated by Colorado River Indian Irr Proj (EIA sector: Electric Utility), and it feeds balancing authority WALC.
When did Headgate Rock open?
Its oldest generator still running came online in 1993.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.