Storage power plant · La Paz, AZ

Atlas VII

Atlas VII is a 300 MW storage power plant in La Paz County, Arizona, operated by Atlas VII LLC. Its oldest generator still running came online in 2025.

Capacity300 MWNameplate, September 2026
Net energy-3.2 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2025

Atlas VII in context

Among the 41 storage plants in Arizona in the EIA's inventory, it is the 6th largest, about 4.8% of the state's 6.3 GW of storage capacity.

La Paz County has 7 power plants of 1 MW or more with 1.6 GW in all; Atlas VII is 19% of that and the largest of 2 storage plants there.

The average electricity customer in La Paz County goes 10 hours a year without power. The county's page has the full outage record.

Where it is

Atlas VII (outlined) and other plants in La Paz County, shaded. 33.583, -113.577.

Plant facts

Operator
Atlas VII LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
La Paz County, AZ
EIA plant ID
68322
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ALT7A Batteries 180 MW · 720 MWh 2025 –
ALT7B Batteries 120 MW · 480 MWh 2025 –

Questions

Atlas VII, answered

How much can Atlas VII store and deliver?

Atlas VII can deliver up to 300 MW and hold 1,200 MWh of energy, from 2 storage units. Its net energy in 2025 was -3.2 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Atlas VII?

Atlas VII is in La Paz County, Arizona, at about 33.583°, -113.577°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in La Paz County goes 10 hours a year without power. The county's page has the full outage record.

Who operates Atlas VII?

It is operated by Atlas VII LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Atlas VII open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.