Storage power plant · Pecos, TX

Avila

Avila is a 160 MW storage power plant in Pecos County, Texas, operated by Engie North America. Its oldest generator still running came online in 2025.

Capacity160 MWNameplate, September 2026
Net energy-5.0 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Avila in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 36th largest, about 1.0% of the state's 16 GW of storage capacity.

Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Avila is 4% of that and the 3rd largest of 12 storage plants there.

The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Avila (outlined) and other plants in Pecos County, shaded. 30.905, -102.916.

Plant facts

Operator
Engie North America
Sector
IPP Non-CHP
Grid operator
ERCO
County
Pecos County, TX
EIA plant ID
65860
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
AVILA Batteries 160 MW · 320 MWh 2025 –

Questions

Avila, answered

How much can Avila store and deliver?

Avila can deliver up to 160 MW and hold 320 MWh of energy, from one battery or storage system. Its net energy in 2025 was -5.0 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Avila?

Avila is in Pecos County, Texas, at about 30.905°, -102.916°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Avila?

It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Avila open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.