Solar power plant · Pecos, TX

Barilla Solar

Barilla Solar is a 30 MW solar power plant in Pecos County, Texas, operated by Leeward Asset Management, LLC. Its oldest generator still running came online in 2015. In 2025 it generated 53 GWh, about what 4,000 average Texas homes use in a year.

Capacity30 MWNameplate, September 2026
Generated53 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators1Oldest from 2015

Barilla Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 171st largest, about 0.1% of the state's 37 GW of solar capacity.

Pecos County has 31 power plants of 1 MW or more with 3.7 GW in all; Barilla Solar is 1% of that and the 13th largest of 13 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608010020182019202020212022202320242025GWh 53
020406080100201920212023202553

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Barilla Solar (outlined) and other plants in Pecos County, shaded. 30.960, -103.350.

Plant facts

Operator
Leeward Asset Management, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Pecos County, TX
EIA plant ID
58710
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BRLA Solar Photovoltaic 30 MW 2015 –

Questions

Barilla Solar, answered

How much power does Barilla Solar produce?

Barilla Solar has 30 MW of capacity from one generator. In 2025 it generated 53 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Barilla Solar power?

Its 2025 output of 53 GWh equals the yearly electricity use of about 4,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Barilla Solar?

Barilla Solar is in Pecos County, Texas, at about 30.960°, -103.350°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Pecos County goes 8.6 hours a year without power, the 132nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Barilla Solar?

It is operated by Leeward Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Barilla Solar open?

Its oldest generator still running came online in 2015.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.