Wind power plant · Jack, TX

Barton Chapel Wind Farm

Barton Chapel Wind Farm is a 120 MW wind power plant in Jack County, Texas, operated by Avangrid Power LLC. Its oldest generator still running came online in 2009. In 2025 it generated 128 GWh, about what 9,600 average Texas homes use in a year.

Capacity120 MWNameplate, September 2026
Generated128 GWhIn 2025
Capacity factor12%Share of the most it could make, 2025
Generators1Oldest from 2009

Barton Chapel Wind Farm in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 179th largest, about 0.3% of the state's 45 GW of wind capacity.

Jack County has 4 power plants of 1 MW or more with 1.0 GW in all; Barton Chapel Wind Farm is 12% of that and the 2nd largest of 3 wind plants there.

Its capacity factor of 12% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030020182019202020212022202320242025GWh 128
01002003002019202120232025128

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Barton Chapel Wind Farm (outlined) and other plants in Jack County, shaded. 33.052, -98.328.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Jack County, TX
EIA plant ID
57156
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BC Onshore Wind Turbine 120 MW 2009 –

Questions

Barton Chapel Wind Farm, answered

How much power does Barton Chapel Wind Farm produce?

Barton Chapel Wind Farm has 120 MW of capacity from one generator. In 2025 it generated 128 GWh, 12% of the most it could have made running flat out all year (its capacity factor).

How many homes does Barton Chapel Wind Farm power?

Its 2025 output of 128 GWh equals the yearly electricity use of about 9,600 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Barton Chapel Wind Farm?

Barton Chapel Wind Farm is in Jack County, Texas, at about 33.052°, -98.328°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Barton Chapel Wind Farm?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Barton Chapel Wind Farm open?

Its oldest generator still running came online in 2009.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.