Wind power plant · Jack, TX
Barton Chapel Wind Farm
Barton Chapel Wind Farm is a 120 MW wind power plant in Jack County, Texas, operated by Avangrid Power LLC. Its oldest generator still running came online in 2009. In 2025 it generated 128 GWh, about what 9,600 average Texas homes use in a year.
Barton Chapel Wind Farm in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 179th largest, about 0.3% of the state's 45 GW of wind capacity.
Jack County has 4 power plants of 1 MW or more with 1.0 GW in all; Barton Chapel Wind Farm is 12% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 12% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Barton Chapel Wind Farm (outlined) and other plants in Jack County, shaded. 33.052, -98.328.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Jack County, TX
- EIA plant ID
- 57156
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BC | Onshore Wind Turbine | 120 MW | 2009 | – |
Nearby
Other plants in Jack County
Questions
Barton Chapel Wind Farm, answered
How much power does Barton Chapel Wind Farm produce?
Barton Chapel Wind Farm has 120 MW of capacity from one generator. In 2025 it generated 128 GWh, 12% of the most it could have made running flat out all year (its capacity factor).
How many homes does Barton Chapel Wind Farm power?
Its 2025 output of 128 GWh equals the yearly electricity use of about 9,600 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Barton Chapel Wind Farm?
Barton Chapel Wind Farm is in Jack County, Texas, at about 33.052°, -98.328°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Barton Chapel Wind Farm?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Barton Chapel Wind Farm open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.