Wind power plant · Jack, TX
Keechi Wind
Keechi Wind is a 110 MW wind power plant in Jack County, Texas, operated by Keechi Wind, LLC. Its oldest generator still running came online in 2015. In 2025 it generated 391 GWh, about what 29,000 average Texas homes use in a year.
Keechi Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 185th largest, about 0.2% of the state's 45 GW of wind capacity.
Jack County has 4 power plants of 1 MW or more with 1.0 GW in all; Keechi Wind is 11% of that and the 3rd largest of 3 wind plants there.
Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Keechi Wind (outlined) and other plants in Jack County, shaded. 33.143, -98.161.
Plant facts
- Operator
- Keechi Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Jack County, TX
- EIA plant ID
- 58838
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| KW1 | Onshore Wind Turbine | 110 MW | 2015 | – |
Nearby
Other plants in Jack County
Questions
Keechi Wind, answered
How much power does Keechi Wind produce?
Keechi Wind has 110 MW of capacity from one generator. In 2025 it generated 391 GWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does Keechi Wind power?
Its 2025 output of 391 GWh equals the yearly electricity use of about 29,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Keechi Wind?
Keechi Wind is in Jack County, Texas, at about 33.143°, -98.161°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Keechi Wind?
It is operated by Keechi Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Keechi Wind open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.