Wind power plant · Jack, TX
Senate Wind LLC
Senate Wind LLC is a 150 MW wind power plant in Jack County, Texas, operated by Algonquin Power Co. Its oldest generator still running came online in 2012. In 2025 it generated 394 GWh, about what 30,000 average Texas homes use in a year.
Senate Wind LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 151st largest, about 0.3% of the state's 45 GW of wind capacity.
Jack County has 4 power plants of 1 MW or more with 1.0 GW in all; Senate Wind LLC is 15% of that and the largest of 3 wind plants there.
Its capacity factor of 30% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Senate Wind LLC (outlined) and other plants in Jack County, shaded. 33.206, -98.365.
Plant facts
- Operator
- Algonquin Power Co
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Jack County, TX
- EIA plant ID
- 57981
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 150 MW | 2012 | – |
Nearby
Other plants in Jack County
Questions
Senate Wind LLC, answered
How much power does Senate Wind LLC produce?
Senate Wind LLC has 150 MW of capacity from one generator. In 2025 it generated 394 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does Senate Wind LLC power?
Its 2025 output of 394 GWh equals the yearly electricity use of about 30,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Senate Wind LLC?
Senate Wind LLC is in Jack County, Texas, at about 33.206°, -98.365°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Senate Wind LLC?
It is operated by Algonquin Power Co (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Senate Wind LLC open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.