Wind power plant · Jack, TX

Senate Wind LLC

Senate Wind LLC is a 150 MW wind power plant in Jack County, Texas, operated by Algonquin Power Co. Its oldest generator still running came online in 2012. In 2025 it generated 394 GWh, about what 30,000 average Texas homes use in a year.

Capacity150 MWNameplate, September 2026
Generated394 GWhIn 2025
Capacity factor30%Share of the most it could make, 2025
Generators1Oldest from 2012

Senate Wind LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 151st largest, about 0.3% of the state's 45 GW of wind capacity.

Jack County has 4 power plants of 1 MW or more with 1.0 GW in all; Senate Wind LLC is 15% of that and the largest of 3 wind plants there.

Its capacity factor of 30% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060020182019202020212022202320242025GWh 394
02004006002019202120232025394

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Senate Wind LLC (outlined) and other plants in Jack County, shaded. 33.206, -98.365.

Plant facts

Operator
Algonquin Power Co
Sector
IPP Non-CHP
Grid operator
ERCO
County
Jack County, TX
EIA plant ID
57981
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Onshore Wind Turbine 150 MW 2012 –

Questions

Senate Wind LLC, answered

How much power does Senate Wind LLC produce?

Senate Wind LLC has 150 MW of capacity from one generator. In 2025 it generated 394 GWh, 30% of the most it could have made running flat out all year (its capacity factor).

How many homes does Senate Wind LLC power?

Its 2025 output of 394 GWh equals the yearly electricity use of about 30,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Senate Wind LLC?

Senate Wind LLC is in Jack County, Texas, at about 33.206°, -98.365°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Jack County goes 11 hours a year without power, the 105th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Senate Wind LLC?

It is operated by Algonquin Power Co (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Senate Wind LLC open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.