Storage power plant · Hillsborough, FL
Bayside Battery Storage
Bayside Battery Storage is a 20 MW storage power plant in Hillsborough County, Florida, operated by Tampa Electric Co. Its oldest generator still running came online in 2026.
Bayside Battery Storage in context
Among the 9 storage plants in Florida in the EIA's inventory, it is the 2nd largest, about 3.6% of the state's 552 MW of storage capacity.
Hillsborough County has 25 power plants of 1 MW or more with 5.1 GW in all; Bayside Battery Storage is 0% of that.
The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.
Where it is
Bayside Battery Storage (outlined) and other plants in Hillsborough County, shaded. 27.908, -82.411.
Plant facts
- Operator
- Tampa Electric Co
- Sector
- Electric Utility
- Grid operator
- TEC
- County
- Hillsborough County, FL
- EIA plant ID
- 69165
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BESS1 | Batteries | 20 MW · 40 MWh | 2026 | – |
Questions
Bayside Battery Storage, answered
How much can Bayside Battery Storage store and deliver?
Bayside Battery Storage can deliver up to 20 MW and hold 40 MWh of energy, from one battery or storage system.
Where is Bayside Battery Storage?
Bayside Battery Storage is in Hillsborough County, Florida, at about 27.908°, -82.411°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Bayside Battery Storage?
It is operated by Tampa Electric Co (EIA sector: Electric Utility), and it feeds balancing authority TEC.
When did Bayside Battery Storage open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.