Storage power plant · Cameron, TX

BESS La Feria

BESS La Feria is a 10 MW storage power plant in Cameron County, Texas, operated by Grenergy USA LLC. Its oldest generator still running came online in 2026.

Capacity10 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

BESS La Feria in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 131st largest, about 0.1% of the state's 16 GW of storage capacity.

Cameron County has 23 power plants of 1 MW or more with 1.6 GW in all; BESS La Feria is 1% of that and the 6th largest of 9 storage plants there.

The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

BESS La Feria (outlined) and other plants in Cameron County, shaded. 26.117, -97.812.

Plant facts

Operator
Grenergy USA LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Cameron County, TX
EIA plant ID
69296
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
LFBA1 Batteries 10 MW · 25 MWh 2026 –

Questions

BESS La Feria, answered

How much can BESS La Feria store and deliver?

BESS La Feria can deliver up to 10 MW and hold 25 MWh of energy, from one battery or storage system.

Where is BESS La Feria?

BESS La Feria is in Cameron County, Texas, at about 26.117°, -97.812°. It is one of 23 power plants of 1 MW or more in the county. The average electricity customer in Cameron County goes 4.3 hours a year without power, the 207th most of 240 counties in Texas. The county's page has the full outage record.

Who operates BESS La Feria?

It is operated by Grenergy USA LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did BESS La Feria open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.