Solar power plant · Hillsborough, FL

Big Bend 1 Solar and Battery Storage

Big Bend 1 Solar and Battery Storage is a 32 MW solar power plant in Hillsborough County, Florida, operated by Tampa Electric Co. Its oldest generator still running came online in 2017. In 2025 it generated 2.2 GWh, about what 166 average Florida homes use in a year.

Capacity32 MWNameplate, September 2026
Generated2.2 GWhIn 2025
Capacity factor1%Share of the most it could make, 2025
Generators2Oldest from 2017

Big Bend 1 Solar and Battery Storage in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 183rd largest, about 0.2% of the state's 14 GW of solar capacity.

Hillsborough County has 25 power plants of 1 MW or more with 5.1 GW in all; Big Bend 1 Solar and Battery Storage is 1% of that and the 12th largest of 17 solar plants there.

Its capacity factor of 1% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Big Bend 1 Solar and Battery Storage (outlined) and other plants in Hillsborough County, shaded. 27.785, -82.385.

Plant facts

Operator
Tampa Electric Co
Sector
Electric Utility
Grid operator
TEC
County
Hillsborough County, FL
EIA plant ID
69187
  • Solar20 MW61%
  • Storage13 MW39%
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 20 MW 2017 –
BESS1 Batteries 13 MW · 25 MWh 2019 –

Questions

Big Bend 1 Solar and Battery Storage, answered

How much power does Big Bend 1 Solar and Battery Storage produce?

Big Bend 1 Solar and Battery Storage has 32 MW of capacity from 2 generators. In 2025 it generated 2.2 GWh, 1% of the most it could have made running flat out all year (its capacity factor).

How many homes does Big Bend 1 Solar and Battery Storage power?

Its 2025 output of 2.2 GWh equals the yearly electricity use of about 166 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Big Bend 1 Solar and Battery Storage?

Big Bend 1 Solar and Battery Storage is in Hillsborough County, Florida, at about 27.785°, -82.385°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.

Who operates Big Bend 1 Solar and Battery Storage?

It is operated by Tampa Electric Co (EIA sector: Electric Utility), and it feeds balancing authority TEC.

When did Big Bend 1 Solar and Battery Storage open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.