Solar power plant · Bell, TX
Big Elm Solar
Big Elm Solar is a 200 MW solar power plant in Bell County, Texas, operated by Big Elm Solar, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 481 GWh, about what 36,000 average Texas homes use in a year.
Big Elm Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 91st largest, about 0.5% of the state's 37 GW of solar capacity.
Bell County has 12 power plants of 1 MW or more with 2.8 GW in all; Big Elm Solar is 7% of that and the 3rd largest of 4 solar plants there.
The average electricity customer in Bell County goes 8.1 hours a year without power, the 141st most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Big Elm Solar (outlined) and other plants in Bell County, shaded. 31.141, -97.217.
Plant facts
- Operator
- Big Elm Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Bell County, TX
- EIA plant ID
- 68180
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BELMS | Solar Photovoltaic | 200 MW | 2025 | – |
Nearby
Other plants in Bell County
Questions
Big Elm Solar, answered
How much power does Big Elm Solar produce?
Big Elm Solar has 200 MW of capacity from one generator. In 2025 it generated 481 GWh.
How many homes does Big Elm Solar power?
Its 2025 output of 481 GWh equals the yearly electricity use of about 36,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Big Elm Solar?
Big Elm Solar is in Bell County, Texas, at about 31.141°, -97.217°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Bell County goes 8.1 hours a year without power, the 141st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Big Elm Solar?
It is operated by Big Elm Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Big Elm Solar open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.