Storage power plant · Bell, TX
Chillingham Storage
Chillingham Storage is a 150 MW storage power plant in Bell County, Texas, operated by Chillingham Storage LLC. Its oldest generator still running came online in 2025.
Chillingham Storage in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 49th largest, about 0.9% of the state's 16 GW of storage capacity.
Bell County has 12 power plants of 1 MW or more with 2.8 GW in all; Chillingham Storage is 5% of that.
The average electricity customer in Bell County goes 8.1 hours a year without power, the 141st most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Chillingham Storage (outlined) and other plants in Bell County, shaded. 31.005, -97.263.
Plant facts
- Operator
- Chillingham Storage LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Bell County, TX
- EIA plant ID
- 68842
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CHILB | Batteries | 150 MW · 150 MWh | 2025 | – |
Nearby
Other plants in Bell County
Questions
Chillingham Storage, answered
How much can Chillingham Storage store and deliver?
Chillingham Storage can deliver up to 150 MW and hold 150 MWh of energy, from one battery or storage system. Its net energy in 2025 was -7.9 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Chillingham Storage?
Chillingham Storage is in Bell County, Texas, at about 31.005°, -97.263°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Bell County goes 8.1 hours a year without power, the 141st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Chillingham Storage?
It is operated by Chillingham Storage LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Chillingham Storage open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.