Solar power plant · Bell, TX
Stillhouse Solar
Stillhouse Solar is a 210 MW solar power plant in Bell County, Texas, operated by Stillhouse Solar LLC. Its oldest generator still running came online in 2025. In 2025 it generated 54 GWh, about what 4,000 average Texas homes use in a year.
Stillhouse Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 69th largest, about 0.6% of the state's 37 GW of solar capacity.
Bell County has 12 power plants of 1 MW or more with 2.8 GW in all; Stillhouse Solar is 7% of that and the 2nd largest of 4 solar plants there.
The average electricity customer in Bell County goes 8.1 hours a year without power, the 141st most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Stillhouse Solar (outlined) and other plants in Bell County, shaded. 30.968, -97.165.
Plant facts
- Operator
- Stillhouse Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Bell County, TX
- EIA plant ID
- 65894
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OCISS | Solar Photovoltaic | 210 MW | 2025 | – |
Nearby
Other plants in Bell County
Questions
Stillhouse Solar, answered
How much power does Stillhouse Solar produce?
Stillhouse Solar has 210 MW of capacity from one generator. In 2025 it generated 54 GWh.
How many homes does Stillhouse Solar power?
Its 2025 output of 54 GWh equals the yearly electricity use of about 4,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Stillhouse Solar?
Stillhouse Solar is in Bell County, Texas, at about 30.968°, -97.165°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Bell County goes 8.1 hours a year without power, the 141st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Stillhouse Solar?
It is operated by Stillhouse Solar LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Stillhouse Solar open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.