Wind power plant · Klickitat, WA
Big Horn Wind Project
Big Horn Wind Project is a 199 MW wind power plant in Klickitat County, Washington, operated by Avangrid Power LLC. Its oldest generator still running came online in 2006. In 2025 it generated 476 GWh, about what 42,000 average Washington homes use in a year.
Big Horn Wind Project in context
Among the 23 wind plants in Washington in the EIA's inventory, it is the 7th largest, about 5.9% of the state's 3.4 GW of wind capacity.
Klickitat County has 11 power plants of 1 MW or more with 1.7 GW in all; Big Horn Wind Project is 12% of that and the 3rd largest of 9 wind plants there.
Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Big Horn Wind Project (outlined) and other plants in Klickitat County, shaded. 45.888, -120.290.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- AVRN
- County
- Klickitat County, WA
- EIA plant ID
- 56361
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 199 MW | 2006 | – |
Questions
Big Horn Wind Project, answered
How much power does Big Horn Wind Project produce?
Big Horn Wind Project has 199 MW of capacity from one generator. In 2025 it generated 476 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Big Horn Wind Project power?
Its 2025 output of 476 GWh equals the yearly electricity use of about 42,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Big Horn Wind Project?
Big Horn Wind Project is in Klickitat County, Washington, at about 45.888°, -120.290°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.
Who operates Big Horn Wind Project?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority AVRN.
When did Big Horn Wind Project open?
Its oldest generator still running came online in 2006.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.