Wind power plant · Klickitat, WA
Juniper Canyon I Wind Project
Juniper Canyon I Wind Project is a 151 MW wind power plant in Klickitat County, Washington, operated by Avangrid Power LLC. Its oldest generator still running came online in 2011. In 2025 it generated 144 GWh, about what 13,000 average Washington homes use in a year.
Juniper Canyon I Wind Project in context
Among the 23 wind plants in Washington in the EIA's inventory, it is the 10th largest, about 4.5% of the state's 3.4 GW of wind capacity.
Klickitat County has 11 power plants of 1 MW or more with 1.7 GW in all; Juniper Canyon I Wind Project is 9% of that and the 4th largest of 9 wind plants there.
Its capacity factor of 11% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Juniper Canyon I Wind Project (outlined) and other plants in Klickitat County, shaded. 45.922, -120.236.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- AVRN
- County
- Klickitat County, WA
- EIA plant ID
- 57320
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 151 MW | 2011 | – |
Questions
Juniper Canyon I Wind Project, answered
How much power does Juniper Canyon I Wind Project produce?
Juniper Canyon I Wind Project has 151 MW of capacity from one generator. In 2025 it generated 144 GWh, 11% of the most it could have made running flat out all year (its capacity factor).
How many homes does Juniper Canyon I Wind Project power?
Its 2025 output of 144 GWh equals the yearly electricity use of about 13,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Juniper Canyon I Wind Project?
Juniper Canyon I Wind Project is in Klickitat County, Washington, at about 45.922°, -120.236°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.
Who operates Juniper Canyon I Wind Project?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority AVRN.
When did Juniper Canyon I Wind Project open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.