Wind power plant · Klickitat, WA
White Creek Wind Farm
White Creek Wind Farm is a 204 MW wind power plant in Klickitat County, Washington, operated by White Creek Wind 1 LLC. Its oldest generator still running came online in 2007. In 2025 it generated 536 GWh, about what 47,000 average Washington homes use in a year.
White Creek Wind Farm in context
Among the 23 wind plants in Washington in the EIA's inventory, it is the 6th largest, about 6.0% of the state's 3.4 GW of wind capacity.
Klickitat County has 11 power plants of 1 MW or more with 1.7 GW in all; White Creek Wind Farm is 12% of that and the 2nd largest of 9 wind plants there.
Its capacity factor of 30% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
White Creek Wind Farm (outlined) and other plants in Klickitat County, shaded. 45.815, -120.342.
Plant facts
- Operator
- White Creek Wind 1 LLC
- Sector
- IPP Non-CHP
- Grid operator
- BPAT
- County
- Klickitat County, WA
- EIA plant ID
- 56487
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 204 MW | 2007 | – |
Questions
White Creek Wind Farm, answered
How much power does White Creek Wind Farm produce?
White Creek Wind Farm has 204 MW of capacity from one generator. In 2025 it generated 536 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does White Creek Wind Farm power?
Its 2025 output of 536 GWh equals the yearly electricity use of about 47,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is White Creek Wind Farm?
White Creek Wind Farm is in Klickitat County, Washington, at about 45.815°, -120.342°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.
Who operates White Creek Wind Farm?
It is operated by White Creek Wind 1 LLC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.
When did White Creek Wind Farm open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.