Wind power plant · Klickitat, WA

Harvest Wind Project

Harvest Wind Project is a 99 MW wind power plant in Klickitat County, Washington, operated by Harvest Wind Project TIC. Its oldest generator still running came online in 2009. In 2025 it generated 244 GWh, about what 22,000 average Washington homes use in a year.

Capacity99 MWNameplate, September 2026
Generated244 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2009

Harvest Wind Project in context

Among the 23 wind plants in Washington in the EIA's inventory, it is the 17th largest, about 2.9% of the state's 3.4 GW of wind capacity.

Klickitat County has 11 power plants of 1 MW or more with 1.7 GW in all; Harvest Wind Project is 6% of that and the 7th largest of 9 wind plants there.

Its capacity factor of 28% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020182019202020212022202320242025GWh 244
01002003004002019202120232025244

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Harvest Wind Project (outlined) and other plants in Klickitat County, shaded. 45.813, -120.347.

Plant facts

Operator
Harvest Wind Project TIC
Sector
IPP Non-CHP
Grid operator
BPAT
County
Klickitat County, WA
EIA plant ID
57152
Where Washington's power comes from → Washington power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
HWP1 Onshore Wind Turbine 99 MW 2009 –

Questions

Harvest Wind Project, answered

How much power does Harvest Wind Project produce?

Harvest Wind Project has 99 MW of capacity from one generator. In 2025 it generated 244 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does Harvest Wind Project power?

Its 2025 output of 244 GWh equals the yearly electricity use of about 22,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Harvest Wind Project?

Harvest Wind Project is in Klickitat County, Washington, at about 45.813°, -120.347°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.

Who operates Harvest Wind Project?

It is operated by Harvest Wind Project TIC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.

When did Harvest Wind Project open?

Its oldest generator still running came online in 2009.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.