Wind power plant · Klickitat, WA
Harvest Wind Project
Harvest Wind Project is a 99 MW wind power plant in Klickitat County, Washington, operated by Harvest Wind Project TIC. Its oldest generator still running came online in 2009. In 2025 it generated 244 GWh, about what 22,000 average Washington homes use in a year.
Harvest Wind Project in context
Among the 23 wind plants in Washington in the EIA's inventory, it is the 17th largest, about 2.9% of the state's 3.4 GW of wind capacity.
Klickitat County has 11 power plants of 1 MW or more with 1.7 GW in all; Harvest Wind Project is 6% of that and the 7th largest of 9 wind plants there.
Its capacity factor of 28% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Harvest Wind Project (outlined) and other plants in Klickitat County, shaded. 45.813, -120.347.
Plant facts
- Operator
- Harvest Wind Project TIC
- Sector
- IPP Non-CHP
- Grid operator
- BPAT
- County
- Klickitat County, WA
- EIA plant ID
- 57152
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HWP1 | Onshore Wind Turbine | 99 MW | 2009 | – |
Questions
Harvest Wind Project, answered
How much power does Harvest Wind Project produce?
Harvest Wind Project has 99 MW of capacity from one generator. In 2025 it generated 244 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does Harvest Wind Project power?
Its 2025 output of 244 GWh equals the yearly electricity use of about 22,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Harvest Wind Project?
Harvest Wind Project is in Klickitat County, Washington, at about 45.813°, -120.347°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Klickitat County goes 0.6 hours a year without power. The county's page has the full outage record.
Who operates Harvest Wind Project?
It is operated by Harvest Wind Project TIC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.
When did Harvest Wind Project open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.