Solar power plant · Navarro, TX
Briar Creek Solar 1
Briar Creek Solar 1 is a 127 MW solar power plant in Navarro County, Texas, operated by Lightsource Renewable Energy Asset Management, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 220 GWh, about what 16,000 average Texas homes use in a year.
Briar Creek Solar 1 in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 126th largest, about 0.3% of the state's 37 GW of solar capacity.
Navarro County has 6 power plants of 1 MW or more with 1.2 GW in all; Briar Creek Solar 1 is 10% of that and the 4th largest of 4 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Briar Creek Solar 1 (outlined) and other plants in Navarro County, shaded. 32.067, -96.585.
Plant facts
- Operator
- Lightsource Renewable Energy Asset Management, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Navarro County, TX
- EIA plant ID
- 63769
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TXBC1 | Solar Photovoltaic | 127 MW | 2021 | – |
Nearby
Other plants in Navarro County
Questions
Briar Creek Solar 1, answered
How much power does Briar Creek Solar 1 produce?
Briar Creek Solar 1 has 127 MW of capacity from one generator. In 2025 it generated 220 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Briar Creek Solar 1 power?
Its 2025 output of 220 GWh equals the yearly electricity use of about 16,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Briar Creek Solar 1?
Briar Creek Solar 1 is in Navarro County, Texas, at about 32.067°, -96.585°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Navarro County goes 3.9 hours a year without power, the 211th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Briar Creek Solar 1?
It is operated by Lightsource Renewable Energy Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Briar Creek Solar 1 open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.